Table 6.5.1.1.3 High-Limit Shutoff Control Settings for Air Economizersb.Table 6.5.1-1 Minimum Fan-Cooling Unit Size for which an Economizer Is Required.6.4.5 Walk-In Coolers and Walk-In Freezers.6.4.4 HVAC System Construction and Insulation.Table 6.4.3.10.1 DDC Applications and Qualifications.
6.2.2 Additional Requirements to Comply with Section 6.6.2.1 Requirements for all Compliance Paths.6 Heating, Ventilating, and Air Conditioning.5.9 Verification, Testing, Commissioning, and Inspection.Table 5.8.3.2 Maximum Air Leakage for Fenestration and Doors.Table 5.8.3.1 Maximum Air Leakage for Materials and Assemblies.5.8 Product Information and Installation Requirements.5.6 Building Envelope Trade-Off Compliance Path.Table 5.5.4.4.1 SHGC Multipliers for Permanent Projections.Figure 5.5.2 Exterior and semiexterior building envelope.Table 5.5.3.1.1 Increased Roof Insulation Levels.Table 5.5-8 Building Envelope Requirements for Climate Zone 8*.Table 5.5-7 Building Envelope Requirements for Climate Zone 7*.Table 5.5-6 Building Envelope Requirements for Climate Zone 6 (A,B)*.Table 5.5-5 Building Envelope Requirements for Climate Zone 5 (A,B,C)*.Table 5.5-4 Building Envelope Requirements for Climate Zone 4 (A,B,C)*.Table 5.5-3 Building Envelope Requirements for Climate Zone 3 (A,B,C)*.Table 5.5-2 Building Envelope Requirements for Climate Zone 2 (A,B)*.Table 5.5-1 Building Envelope Requirements for Climate Zone 1 (A,B)*.Table 5.5-0 Building Envelope Requirements for Climate Zone 0 (A,B)*.5.5 Prescriptive Building Envelope Compliance Path.5.3 Simplified Building Compliance Path.5.2.2 Additional Requirements to Comply with Section 5.5.2.1 Requirements for All Compliance Paths.4.2.5 Verification, Testing, and Commissioning.4.1.9 Reference Standard Reproduction Annexes.4.1.3 Alternative Materials, Methods of Construction, or Design.3 Definitions, Abbreviations, and Acronyms.